938290285
This email address is being protected from spambots. You need JavaScript enabled to view it.
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us
CH Tavascan
Featured
Central Hidroelèctrica de Tavascan a Lladorre, Lleida. Central hidroelèctrica de 151 MW.
Transformador
Sala de màquines
Additional Info
Customer:
Endesa Generación
Date:
2007
Project type:
Central reformada
Reservoir:
Rumedo / Graus
Town:
Lladorre
Province:
Lleida
Autonomous comunity:
Catalunya
Country:
Espanya
Power plant type:
Reversible
Turbine:
2 grups pelton vertical (Rumedo) / 1 grup francis vertical (Graus)
Water head:
598,50 m (Rumedo) / 247,30 m (Graus)
Turbine flow:
14 m3/s (Rumedo) / 14 m3/s (Graus)
Generating voltage:
11.000 V
Installed capacity:
119.600 kW (Rumedo) / 31.820 kW (Tavascan)
Grid voltage:
220.000 V
Mapa de situació:
Tweet
Published in
Catalonia
Tagged under
hp
spain
catalonia
endesa
graus
romedo
francis
dam
reformed
pelton
Related items
CH La Cuchilla (Panamà)
CH Las Fuentes II (Guatemala)
CH Las Cruces (Panamà)
CH Can Caballé
CH Guixaró
More in this category:
« CH Espot Torrassa
CH Sant Maurici »
back to top
FaLang translation system by Faboba
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us