938290285
This email address is being protected from spambots. You need JavaScript enabled to view it.
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us
CH Cabo
Featured
Central Hidroelèctrica de Cabo, a Celanova, Galícia. Central hidroelèctrica de 4,9 MW
Detall armaris de potència i control
Sala de màquines
Detall armari de control
Additional Info
Customer:
Hidromedia de Galícia
Date:
1998
Project type:
Nova construcció
River:
Deva
Town:
Celanova
Province:
Ourense
Autonomous comunity:
Galícia
Country:
Espanya
Power plant type:
Embassament
Turbine:
Pelton vertical
Water head:
224,3 m
Turbine flow:
2,6 m3/s
Installed capacity:
4.900 kW
Mapa de situació:
Tweet
Published in
Galicia
Tagged under
hp
spain
reservoir
nova
galicia
pelton
deva
Related items
CH La Cuchilla (Panamà)
CH Las Fuentes II (Guatemala)
CH Las Cruces (Panamà)
CH Can Caballé
CH Guixaró
More in this category:
« CH La Merca
CH Castro Caldelas »
back to top
FaLang translation system by Faboba
Home
The company
About Aplitelc
Integrated management system
Quality policy and CSR
Catalogues
Subscripció al butlletí
Services
Engineering
Renewable energies
Automation and programming
Industrial installations
Maintenance
Projects
Hydroelectric power plants
Spain
Panama
Guatemala
Wind turbines
Industrial installations
Cooperation projects
Blog
Contact us